Daily News
Project Acronym: IDDP-1 | State: Completed | Expedition ID: 5029
ins.: 2009-06-29 02:00; ( Age: 15 yrs )
Category:
IDDP_
IDDP: 2009-06-29
This morning preparations for running the 9 5/8" production casing ...
This morning preparations for running the 9 5/8" production casing with a 9 5/8" liner have been ongoing. Early this morning a team arrived from Norway to manage the use of the annulus packer and the Peak C-Flex unit. The Peak C-Flex is a sleeve based cementing valve which allows you controlled access to the casing to casing annulus without reducing the integrity of the casing string. The casing and liner will be emplaced in a single run.
- Links:
- /fileadmin/icdp/projects/data/iddp/2009_06_29/DIS_OTHER.htm