Daily News
Project Acronym: SBDP | State: Completed | Expedition ID: 5012
▾▴ Toggle Texts
▾▴ Toggle Images
◱ Full Size Pics
⊻ Bottom of Page
... (?TBD)
(inserted: 13.05.2015 02:00)Songliao Basin: 2015-05-13 ˇ
depth 2956.35m. Core 31 tripping out
depth 2956.35m. Core 31 tripping out (inserted: 12.05.2015 02:00)Songliao Basin: 2015-05-12 ˇ
depth 2946.70m,core 30 is tripping out
depth 2946.70m,core 30 is tripping out (inserted: 12.05.2015 02:00)Songliao Basin: 2015-05-12 ˇ
depth 2946.70m,core 30 is tripping out
depth 2946.70m,core 30 is tripping out (inserted: 11.05.2015 02:00)Songliao Basin: 2015-05-11 ˇ
depth 2946.70m,core 30 is tripping out
depth 2946.70m,core 30 is tripping out (inserted: 11.05.2015 02:00)Songliao Basin: 2015-05-11 ˇ
depth 2946.70m,core 30 is tripping out
depth 2946.70m,core 30 is tripping out (inserted: 10.05.2015 02:00)Songliao Basin: 2015-05-10 ˇ
depth 2946.70m,coer 30 is tripping out
depth 2946.70m,coer 30 is tripping out (inserted: 10.05.2015 02:00)Songliao Basin: 2015-05-10 ˇ
depth 2946.70m,coer 30 is tripping out
depth 2946.70m,coer 30 is tripping out (inserted: 09.05.2015 02:00)Songliao Basin: 2015-05-09 ˇ
depth:2936.90m,core 29 data:drilled length:9.41m(2927.49-2936.90m)core recorvery 8.95m,95.1%.
depth:2936.90m,core 29 data:drilled length:9.41m(2927.49-2936.90m)core recorvery 8.95m,95.1%. (inserted: 09.05.2015 02:00)Songliao Basin: 2015-05-09 ˇ
depth:2936.90m,core 29 data:drilled length:9.41m(2927.49-2936.90m)core recorvery 8.95m,95.1%.
depth:2936.90m,core 29 data:drilled length:9.41m(2927.49-2936.90m)core recorvery 8.95m,95.1%. (inserted: 08.05.2015 02:00)Songliao Basin: 2015-05-08 ˇ
the main work of today:core 29 drilling,core 28 message, drilled
the main work of today:core 29 drilling,core 28 message, drilled length :6.59 core recovery 6.87,104.2% (inserted: 08.05.2015 02:00)Songliao Basin: 2015-05-08 ˇ
the main work of today:core 29 drilling,core 28 message, drilled
the main work of today:core 29 drilling,core 28 message, drilled length :6.59 core recovery 6.87,104.2% (inserted: 07.05.2015 02:00)Songliao Basin: 2015-05-07 ˇ
the main work of today:core 28 tripping out
the main work of today:core 28 tripping out (inserted: 07.05.2015 02:00)Songliao Basin: 2015-05-07 ˇ
the main work of today:core 28 tripping out
the main work of today:core 28 tripping out (inserted: 06.05.2015 02:00)Songliao Basin: 2015-05-06 ˇ
the main work of today:core 28 triping in
the main work of today:core 28 triping in (inserted: 06.05.2015 02:00)Songliao Basin: 2015-05-06 ˇ
the main work of today:core 28 triping in
the main work of today:core 28 triping in (inserted: 05.05.2015 02:00)Songliao Basin: 2015-05-05 ˇ
The 27th core data:drilled length :9.12m(2911.78-2920.90m),core length:8.67.core recovery:95.1%.
The 27th core data:drilled length :9.12m(2911.78-2920.90m),core length:8.67.core recovery:95.1%. (inserted: 04.05.2015 02:00)Songliao Basin: 2015-05-04 ˇ
The 26th core data:Drilled length:9.00m,core length:8.90m,core recovery:98.9%.
The 26th core data:Drilled length:9.00m,core length:8.90m,core recovery:98.9%. (inserted: 04.05.2015 02:00)Songliao Basin: 2015-05-04 ˇ
The 26th core data:Drilled length:9.00m,core length:8.90m,core recovery:98.9%.
The 26th core data:Drilled length:9.00m,core length:8.90m,core recovery:98.9%. (inserted: 03.05.2015 02:00)Songliao Basin: 2015-05-03 ˇ
Waiting for the 26th core to get out of the
Waiting for the 26th core to get out of the underground. (inserted: 03.05.2015 02:00)Songliao Basin: 2015-05-03 ˇ
Waiting for the 26th core to get out of the
Waiting for the 26th core to get out of the underground.