This morning we have excavated for, and installed a cellar ...
Doug Schmitt taking a look at the wireline tools, which are arrayed on the core table. In the background an exuberant driller, and a site being prepared for a new rig.

This morning we have excavated for, and installed a cellar around the wellhead. We expect to move the deep-drilling rig over the hole late today, trip in pipe early tomorrow and be drilling again by late morning. Exciting times! The team are also considering the results of the wireline run into uncased rock for about 10 m beneath the 10 inch casing.