Highlights

06.07.2018

Oman Sampling Party onboard drilling vessel Chikyu

In the next two months the cores taken during Phase II of the Oman Drilling Project will be described and analyzed onboard Chikyu. The scientists work in groups - the igneous, alteration, structural, geochemistry, physical...

Category: Highlights



07.06.2018

Marco Bohnhoff

Marco Bohnhoff is Professor for Experimental and Borehole Seismology and head of GFZ-section 4.2 'Geomechanics and Rheology'. He brings ICDP experience through his role as PI in various ICDP projects (GONAF, Koyna, STAR). 

Category: Highlights



29.05.2018

ICDP Executive Committee Meeting in China

The Executive Committee discusses about 12 Full Proposals, seven Workshop Proposals and one Pre-Proposal submitted by January 15, 2018. Workshop Proposals will be decided on by the EC, while Full Proposals will be decided on by...

Category: Highlights



28.02.2018

Oman Drilling

The final core of OmanDP Phase 2

Category: Highlights



16.02.2018

Oman Drilling

first core from site BA4A

Category: Highlights



20.12.2017

ICDP Image Video

The ICDP Image Video is now online

Category: Highlights



14.10.2017

ICDP Post-Operations International Workshop

This post-operation workshop in Pune, India highlights the achivements of the Koyna Pilot Hole drilling and discusses opportunities for future deep drilling at Koyna, a world-class site for studying reservoir-triggered...

Category: Highlights



01.09.2017

New milestone in Songliao Drilling

SK-II completed its stage IV (216mm diameter) last November at the depth of 5922.58m and after a long winter shutdown, started its final stage V (152mm diameter) on 4th May, 2017. As at the hole bottom, the temperature rises to...

Category: Highlights



17.05.2017

Hydrofrac tests in the Koyna pilot hole

The tests were carried out by a team comprising experts from Mesy-Solexperts and scientists from the Borehole Geophysics Research Laboratory (BGRL). The tests, made in the granitic basement, are the first of it's kind in the...

Category: Highlights



01.05.2017

EGU 2017

EGU 2018 will take place April 8-13 in Vienna - we are looking forward seeing you there!

Category: Highlights



27.04.2017

Important Transition at ICDP

Left: Brian Horsfield. Right: Axel Liebscher

As Chair of the ICDP Assembly of Governors, I have the bittersweet task of announcing the retirement of Brian Horsfield, who has ably served as the Chair of ICDP’s Executive Committee for the past six years. During Brian’s...

Category: Highlights



27.03.2017

SAG Meeting in Bern

Group Photo Further evaluation at the Executive Committee meeting in June 5-6.

Category: Highlights



20.11.2016

DeepChalla

East Africa

Category: Highlights



03.11.2016

DeepCHALLA

Drilling successfully completed with 225 m of drilled core

Category: Highlights



30.08.2016

India renewed membership

MoU between University of Earth Sciences, India and GFZ Potsdam signed on August 30.

Category: Highlights



04.01.2016

20 Years of ICDP

The Union Symposium Speakers

Deep Geofluids: the bringers of change

Category: Highlights



New milestone in Songliao Drilling


SK-II completed its stage IV (216mm diameter) last November at the depth of 5922.58m and after a long winter shutdown, started its final stage V (152mm diameter) on 4th May, 2017.

As at the hole bottom, the temperature rises to 205 Celsius, and the ground stress releases, a strong collapse occurred at the barefoot interval beneath the casing pipe, which is the most serious and complex accident since SK-II starts. After many ineffective attempts to recover the borehole, and the collapse has become increasingly serious. The command decides to inject cement into the borehole for wall stabilization. Since there is no experience for well cementation in this high temperature in China, the well cementing team has made a lot of experiments and field preparation, and finally succeeded in stabilizing the wall.

On 12th Aug, the stage IV (152mm diameter) started from 5932m, and reached the new milestone 6326m on 23th October.

A key interface of the sedimentary rock and volcanic rock of Huoshiling Formation is completely cored. At the moment, SK-II is drilling its deepest and most difficult interval, which is a great challenge for the coring and drilling fluid technology as the super high temperature and pressure environment. Songliao Team will forge ahead and make further progress towards the ultimate goal depth of 6400m.

Twenty-meter-long core tripping out from 5981.29 to 6002.23m