icdp logo Logged in as (no login found) (groups unkown)

Geophysical Well-Logging Campaigns Report
Lake El'gygytgyn Drilling Project

This page is is the first of four pages that belong together.
(1) Select wellhole, and logging campaign (this page); (2) select logging run; (3) select files; (4) Download files.
Click on link in column "Campaign" to proceed to step 2.

Select borehole:

Current selection:


Bottom of page
All campaigns All campaigns for this hole/these holes

Campaigns:

Site Well Campaign Time Companies Bit Size Casing Open Hole Mud Depth Reference
Begin End Hours Density Type pH Resistivity
1 C EDP1 - first downhole logging
76 files, 156.92 GB
2009-04-04 10:30:42.000 2009-04-05 12:38:42.000 26 GFZ Potsdam: J. Kück, M. Töpfer

PQ, ID=101mm, in. -1.1-323.65m 1 - 198.65 m, 5.5 inch 320 - 184.55 m bentonite mud floor clamp (part of the drill rig)
1 C EDP1 - second downhole logging
32 files, 25.64 GB
2009-04-08 08:48:42.000 2009-04-08 19:40:42.000 11 GFZ Potsdam: J. Kück, M. Töpfer

PQ, ID=101mm, in. -1.1-369.55m 1 - 198.65 m, 5.5 inch 320 - 308.60 m bentonite mud floor clamp (part of the drill rig)
1 C EDP1 - third downhole logging
32 files, 27.13 GB
2009-04-12 12:08:42.000 2009-04-13 00:40:42.000 12.25 GFZ Potsdam: J. Kück, M. Töpfer

PQ, ID=101mm, in. -1.1-445.85m 1 - 198.65 m, 5.5 inch 360.45 - 445.85 m bentonite mud floor clamp (part of the drill rig)
1 C EDP1 - fourth downhole logging
28 files, 64.86 GB
2009-04-16 08:34:42.000 2009-04-16 23:09:42.000 14.55 GFZ Potsdam: J. Kück, M. Töpfer

HQ, ID=76mm, in. -1.1-565m 1 - 198.65 m, 5.5 inch, 1 - 443m, PQ pipe 434 - 565 m bentonite mud floor clamp (part of the drill rig)
Top of page