HSPDP, Turkana, Kenya, 2013-JUL

OSG performed downhole logging in the HSPDP project in three campaigns at 3 sites: Baringo/Tugen Hills, Turkana, and Magadi.

This is the 2nd OSG logging campaign at the second HSPDP site Turkana.

Difficult hole conditions at the Turkana site caused a stuck drill pipe that could not be removed and hence allowed only cased hole logging (GR/SGR & hole inclination). 

 

HSPDP Turkana, Kenya            2013-JUL           0-197 m 

Tools: GR, SGR, DIP (hole deviation) 

Staff: Kück, Rey Abasolo

 

Back