The Outokumpu Deep Drilling Project (ODDP)
  • Geologic age: neoproterozoic
  • Number of drillsites (drillholes):
  • Drilled length: m
  • Cored length: -
  • Core recovered, length: -
  • Cored length / Total length ratio: -
  • Core recovered / Total length ratio: -

Co-Operating Principal Investigators

begin of drilling April 2004 End of drilling early 2005
drilling operations and downhole logging have been finalized, scientific evaluations are ongoing
Repository Information: Where the rock samples are stored.
(No data returned by database query)
62° 43' 4'' N, 29° 3' 43'' E

Looking for Data ?

Please change to the Former-ICDP-Site if you are missing data on this page. It will take a bit more time to transfer all information to the new site. We apologize for this inconvenience.