Baikal Drilling Project (BDP)
  • Geologic age: quaternary
  • Number of drillsites (drillholes): 1(2)
  • Drilled length: 463.8 m
  • Cored length: 156.2 m
  • Core recovered, length: 156.2 m
  • Cored length / Total length ratio: 100%
  • Core recovered / Total length ratio: 33.68%
begin in 1989; end in 1999
completed
Repository Information: Where the rock samples are stored.
Lake Sediments:
This is the preferred URL to be used in publications, citations etc.
53° 29' N, 108° 10' E

Looking for Data ?

Please change to the Former-ICDP-Site if you are missing data on this page. It will take a bit more time to transfer all information to the new site. We apologize for this inconvenience.