Project meta data

Drilling into seismogenic zones of M2.0 – M5.5 earthquakes in deep South African gold mines (DSEIS)
  • Geologic age: archean
  • Number of drillsites (drillholes): 1(1) 2017-Oct-04
  • Drilled length: 817.0 m
  • Cored length: 817 m
  • Core recovered, length: 817 m
  • Cored length / Total length ratio: 100%
  • Core recovered / Total length ratio: 100%
workshop proposal done: Jan 2015; workshop proposal approved, planned for 31 Oct to 3 Nov 2015 in Johannesburg; new drilling proposal 2016, approved; drilling commenced in June 2017
ongoing
Repository Information: Where the rock samples are stored.
(No data returned by database query)
This is the preferred URL to be used in publications, citations etc.
26° 24' 58'' S, 27° 25' 38'' E