Downhole Monitoring
- Outside the casing, facing the rock formation and permanently cemented in place, and
- Inside casing or open hole by means of wire-line or pipe deployed with a retrieval option.
◊ Common to both types is the extended requirement to down-hole life expectancy as a minimum system reliability of 5 years mean-time between failure (MTBF) as well as measurement repeatability over periods of 10-15 years and array design criteria with special emphasis on redundancy of sensors and telemetry lines in order to mitigate the risk for premature failure.
In an attempt to cover the majority of the PDM applications in scientific well drillings, an environmental regime of 125°C at 500 bar for +20.000 hours continuous operation is targetted for components survival.
Contact: Bernhard Prevedel
CONTENT of this Portal are ICDP collected reports, data and recommendation for:
- Purpose and definitions of PDM applications
- Deployment systems for PDM arrays
- Line
- Wire rope with multi-lead PU cable clamped to the side
- Armoured electric or FO augmented cable
- Coil Tubing
- Steel tubing with inner armoured wireline
- Composite coil tubing with integrated wires/lines
- Pipe
- Casing, Tubing or Drill Pipe
- Casing, Tubing or Drill Pipe
- Line
- Hole-anchoring systems
- Retrievable and multiple settable devices
- Mechanical, hydraulic and free-suspended on cable or pipe
- Permanent anchors
- outside the casing cemented or bottom hole cemented
- outside the casing cemented or bottom hole cemented
- Retrievable and multiple settable devices
- Measurements and sensors available in academia and industry
- Geophysical
- Geometrical
- Geomechanical
- Environmental
- Geochemical
- Data Recording and data management solutions
- Down-hole memory
- mechanical recording
- electric memory
- Real-time surface telemetry
- Down-hole memory
- Operations risk management prodecures and mitigation strategies
- Type of failures and probabilities
- Redundancy concepts
- Failure risk management tools
- Mitigation strategies<
- State of the art incl. new developments in PDM technology
- Industry available
- Academia available
- ICDP projects and their scientific requirements for PDM
- Array design principles and recommendations for ICDP applications
- Economics: Investment and repair/maintenance cost
- Alternative PDM methods and solutions
- Outlook and needs for continued research
| News Highlights | ||||||||||||||||||||||||||||
ECORD/ICDP MagellanPlus Call for Proposals Lake Ohrid Drilling Recovered Continuous Record Lake El’gygytgyn Second Overview Paper Scientific Drilling Issue 15 Online 2013 International Van Earthquake Symposium NSF Workshop: Drilling Active Tectonics and Magmatism New SAG Composition for 2013 The Fennoscandian Arctic Russia - Drilling Early Earth Project Scientific Drilling Issue 14 Online Imaging the Past to Imagine our Future | ||||||||||||||||||||||||||||
| Daily News from Sites | ||||||||||||||||||||||||||||
Lake Ohrid:
The borehole loggers finished logging the hole in the early morning hours. However, strong winds at 7AM... | ||||||||||||||||||||||||||||
| Calendar | ||||||||||||||||||||||||||||
NSF Workshop: Drilling Active Tectonics and Magmatism NSF Workshop: Drilling into High-Enthalpy Geothermal Systems 2013 International Van Earthquake Symposium | ||||||||||||||||||||||||||||
| Contacts | ||||||||||||||||||||||||||||
| For contact information about the ICDP members please select the first letter of the name from the list below. To see the full information or update your personal data you must login first.
| ||||||||||||||||||||||||||||